A mobile home on a holiday park is normally intended for holiday and recreational use. Park licences and site rules may restrict full-time or permanent occupation. If you are considering a mobile home as your main home, establish the permitted use of the land before choosing a model.
Planning requirements depend on the proposed use, duration, location and site circumstances. Contact the planning department of the relevant local authority before purchasing a mobile home or starting site works. Ask for written guidance where possible and use a planning professional if the proposal is complex.
A mobile home can be a practical temporary base during a house build, but it should not be assumed to be automatically exempt from planning requirements. Discuss the proposed temporary accommodation with the local planning authority and include it in the planning process where required.
For extended or colder-season use, look for strong insulation, double glazing, an efficient heating system and the manufacturer’s appropriate seasonal or residential specification. Ask exactly what the quoted specification includes rather than relying on terms such as “winter pack” alone.
Confirm how electricity, water, wastewater, gas and communications will be provided. Connections, capacity and compliance should be assessed before delivery, using qualified contractors where required. Private sites may need additional infrastructure and approvals.
The base must be suitable, level and accessible for the transport and lifting equipment needed. Measure gateways, bends, overhead cables, trees and nearby structures. A professional access survey can identify whether cranage or other specialist equipment will be needed.
Allow for heating and electricity, gas, maintenance, insurance and any site or service charges. Holiday park owners should also confirm annual pitch fees, what those fees include, seasonal opening arrangements and park rules.
Correct siting, levelling, anchoring and connection work protects the mobile home and helps it perform as intended. Harry Farrell & Sons can assess access and manage delivery and installation throughout Ireland once the required permissions and site arrangements are in place.
This guide provides general practical information, not planning or legal advice. Requirements can vary, so confirm the position with the relevant local authority and qualified professionals for your particular site.